The Problem : Water Discharge was measured with visual inspection of staff gauge. Recording and human interpretation error was introduced.
The Solution : Water Level Gauge with Temperature sensor introduced and data fed into PowerBI to visualize data.
The Results : Continuous water level and temperature record. Next step is to add cellular modem to remotely monitor sensor data and feed real time into PowerBI report.